Faber Industrie
SUPPLIER OF HIGH PRESSURE CYLINDERS TO THE WORLD

Production cycle from tube

01 Steel Tubes                                01 Steel Tubes
02 Cutting to Length                          02 Cutting to Length
03 Base Spinning                              03 Base Spinning
04 Base Shaping & Internal Dressing           04 Base Shaping & Internal Dressing
05 Leak Test of Base                          05 Leak Test of Base
06 Shell Inspection                           06 Shell Inspection
07 SurfaceTesting                             07 SurfaceTesting
08 Neck Spinning                              08 Neck Spinning
09 Neck Pre Machining                         09 Neck Pre Machining
10 Quenching & Tempering                      10 Quenching & Tempering
11 Internal & External Shot Blasting          11 Internal & External Shot Blasting
12 Hardness Testing                           12 Hardness Testing
13 Neck Threading                             13 Neck Threading
14 Visual Inspection                          14 Visual Inspection
15 Ultrasonic Testing                         15 Ultrasonic Testing
16 Stamp Marking                              16 Stamp Marking
17 Proof or Volumetric Expansion Hydro Testing17 Proof or Volumetric Expansion Hydro Testing
18 Surface Coating                            18 Surface Coating
19 Final Inspection                           19 Final Inspection
20 Final Operations (Valving)                 20 Final Operations (Valving)
21 Packing & Despatch                         21 Packing & Shipping